|
Some checks failed
CI / test (push) Failing after 40s
领域建模拷问产出:CONTEXT.md 新增「周期评估」章节(评估活动 / 服务周期 窗口 / 活动计划);ADR-0003 记录活动分期(v1 静态地基、v2 自适应回路) 与「OpenClaw 进调度热回路」的取舍。 |
||
|---|---|---|
| .. | ||
| 0001-scenario-versioning-for-comparability.md | ||
| 0002-pass-rate-includes-execution-failures.md | ||
| 0003-campaign-phased-static-then-adaptive.md | ||