A domain-agnostic horizontal timeline: an axis over the service-cycle window with offset-positioned markers, stable per-colorKey colours, optional badges, hover tooltips, click callbacks, and an optional legend. Shared base for the plan preview (09) and process timeline (10). (v0.6 ticket 08) |
||
|---|---|---|
| .. | ||
| src | ||
| index.html | ||
| package-lock.json | ||
| package.json | ||
| tsconfig.json | ||
| tsconfig.node.json | ||
| vite.config.ts | ||